|
|
The foundation is built on solid rock
|
Reinforcements fastened in holes drilled in the ground
|
|
|
Screws
for the pillar base fastened in concrete
|
The wooden
plate holds the screws in position while concrete dries
|
|
|
Some days
later the plate could be removed
|
Positioning
lower nuts to support the base of the pillar
|
|
The top of the pillar with the arrangement for fastening
the equatorial head and the mechanism for leveling.
|
|
|
The base
of the Vixen GPDX mount in place
|
Adjusting
everything level
|
|
|
Ready to
observe
|
The Vixen
R200SS equipped with Canon EOS20D DSLR
|